ThinkGeoEnergy – Geothermal News & Insights

Geothermal drilling for greenhouse farming begins in Eskisehir, Türkiye

Armen Energy will begin geothermal resource exploration in a 4,800-hectare area for a greenhouse project in the Mahmudiye municipality in Eski?ehir, Türkiye.

Armen Energy Consulting Engineering Co. Ltd. (Armen Enerji Müsavirlik Mühendislik Ltd. Sti.) is preparing to explore for geothermal resources near the Ismetpasa neighborhood of the Mahmudiye district in Eskisehir, Türkiye.

The project will involve drilling two wells, each with a maximum depth of 1,200 meters, on a 4,800-hectare site. Work is planned for 25 days a month, 8 hours a day, year-round. A six-person team will be responsible for the drilling process.

The aim is to use the hot water generated in greenhouse farming. If sufficient temperature and flow are achieved, the company aims to implement technological greenhouse projects suitable for soilless agriculture, using geothermal energy.

Wells deemed unproductive will be used as reinjection wells, allowing water to be returned to the groundwater. At the end of the study, the quantity, quality, and suitability of the reserve will be assessed, and a decision will be made on whether to proceed to production.

In addition to the Armen Energy project, two significant capacity increases and new drilling plans are also on the agenda in the Mahmudiye region:

The project files prepared for both companies were reviewed by the Eskisehir Provincial Directorate of Environment, Urbanization and Climate Change, which issued a decision declaring “EIA Not Required.” This allows drilling operations to continue in an environmentally sound and legally sound manner.

RELATED: Geothermal greenhouse in Dikili, Türkiye to receive increased World Bank funding

Source: Enerji Gunlugu via our Turkish language platform JeotermalHaberler

Exit mobile version